Winter work

When I bought Guiding Star, the surveyor suggested replacing the keel bolts. Once we hauled the boat out in Bristol in December 2016, it was clear he was right. Martin from RB Boatbuilding lifted out five tons of lead to get at the bolts.

That was just the start of the winter work.